Etimaad Homes
2 Marla Houses in Al-Kabir Town Phase 2. Ground + First Floor. 2.5-Year Easy Plan.
Abu Bakar Block, Al-Kabir Town Phase 2, Raiwind Road, Lahore
Ratings are AIWA editorial assessments based on due diligence. Not a guarantee of investment returns.
Developer
Al-Kabir Developers
Location
Abu Bakar Block, Phase 2
Property Type
2 Marla House
Structure
Ground + First Floor
Total Price
PKR 85,00,000
Society Status
LDA-Approved
Project Gallery
Etimaad Homes — Street Elevation, Abu Bakar Block
Etimaad Homes — Front Elevation, Single Unit
Ground Floor Layout — 3D Plan View
First Floor Layout — 3D Plan View
Ground Floor Interiors — Bedroom, Kitchen, Living, Bathroom
First Floor Interiors — Master Bedroom, Bathroom, LivingAbout Etimaad Homes
Etimaad Homes is a 2 Marla residential house project located in Abu Bakar Block, Al-Kabir Town Phase 2 — one of Lahore's largest LDA-approved housing societies on Main Raiwind Road, directly opposite Lake City.
Each unit is a Ground + First Floor independent house on a 2 Marla plot. The ground floor provides a master bedroom, living and dining areas, kitchen, and bathroom. The first floor offers two additional bedrooms with attached bathrooms — making it a complete 3-bedroom family home across two levels.
The payment plan spans 2.5 years and is linked to construction milestones — Digging and Grey Work tranches are paid as construction progresses, giving buyers direct visibility into site progress at each payment stage. This structure is common in constructed housing projects and aligns buyer payments with on-ground activity.
Al-Kabir Town Phase 2 is an established, delivered society with live residents. Abu Bakar Block possession announcements have been made by the developer. This is a buy-and-build opportunity in a society where infrastructure, utilities, and community are already in place.

Floor by Floor
First Floor
Ground Floor
Payment Plan — Etimaad Homes
2 Marla House | Abu Bakar Block, Al-Kabir Town Phase 2
Booking → Confirmation → Monthly (×30) → Digging → Grey Work → Bi-Annual → Possession
| Tranche | Amount (PKR) | Notes |
|---|---|---|
| Booking | PKR 8,00,000 | At reservation |
| Confirmation | PKR 8,00,000 | On file confirmation |
| Monthly Installment | PKR 88,000 | × 30 months (2.5 years) |
| Digging | PKR 8,00,000 | At foundation digging stage |
| Grey Work | PKR 8,00,000 | At grey structure completion |
| Bi-Annual | PKR 2,52,000 | × schedule |
| On Possession | PKR 14,00,000 | At key handover |
| TOTAL PRICE | PKR 85,00,000 |
Payment plan is milestone-linked — Digging and Grey Work tranches are released at verified construction stages, giving you full visibility of on-ground progress. Contact AIWA for current construction status and unit availability.
Features & Amenities
Prime Location — Al-Kabir Town Phase 2, Raiwind Road, Lahore
Al-Kabir Town Phase 2 is located on Main Raiwind Road, Lahore — directly opposite Lake City's Main Boulevard. The society sits in Lahore's fastest-growing southern residential corridor, surrounded by Bahria Orchard, Lake City, Valencia Town, and DHA Rahbar. Ring Road access via Raiwind Road connects residents to DHA, the airport, and central Lahore without passing through the inner city.
Abu Bakar Block is an established block within Phase 2, with infrastructure in place and possession announcements underway from Al-Kabir Developers. This is a mature society address — not a pre-launch scheme — meaning roads, utilities, and community are already operational.
Why Invest in Etimaad Homes?
PKR 85 Lac | Complete 3-Bed House
A fully independent Ground + First Floor house at PKR 85 Lac total. PKR 8 Lac books your unit. 30 monthly installments at PKR 88,000 keep the ongoing commitment manageable — affordable for families and rental investors alike.
LDA-Approved Society | Live Community
Al-Kabir Town Phase 2 is LDA-approved with WASA and LESCO approvals in place. Unlike pre-launch schemes, Abu Bakar Block is an active, developing block in an already occupied society. Roads, utilities, mosque, schools, and commercial areas are operational.
Construction-Linked Plan
Digging and Grey Work payments are released only at verified construction stages. This milestone-linked structure means your money moves with actual on-ground progress — not on a calendar. A transparent payment structure for buyers who want accountability.
Raiwind Road has been Lahore's strongest performing residential corridor over the past five years, with multiple LDA-approved societies delivering consistent capital appreciation. Al-Kabir Developers have successfully delivered Phase 1 in full and are progressing Phase 2 block by block with verified possession handovers. A 2 Marla house in an LDA-approved, delivered society at PKR 85 Lac with a 2.5-year milestone-linked plan is a low-risk entry for first-time buyers and investors seeking rental income in an established community. Contact AIWA for site visit, construction update, and booking.
Frequently Asked Questions
Book Your Home in Al-Kabir Town Phase 2
3-bedroom house from PKR 85 Lac.
PKR 8 Lac books your unit.
2.5-year milestone-linked payment plan.
LDA-approved society. Contact AIWA for unit availability and site visit.
AIWA Properties — Dream Gardens Office
Office No. 5, First Floor, Signature Heights Dream Gardens Phase 2, Lahore
AIWA Properties — Bahria Town Office
222-A Sector C, Main Commercial Market Bahria Town Lahore
Book Consultation
